Displaying items by tag: csx
Helene: After weeks of dredging, CSX receives stop-work order on Nolichucky Gorge railroad destroyed by tropical storm
Epic flooding from Tropical Storm Helene destroyed the CSX railroad bed along the length of the Nolichucky River Gorge near Erwin. TDEC and the U.S. Army Corps of Engineers this month ordered the transportation company to stop dredging materials from the river to repair its railroad line. Jonathan Mitchell for Hellbender Press
Company accused of illegally mining river rocks, sediment to shore up rail lines washed out by Helene
This story was originally published by Tennessee Lookout.
ERWIN — The U.S. Army Corps of Engineers and Tennessee environmental regulators ordered CSX Transportation to stop dredging the Nolichucky River Gorge for rocks and sediment being used to shore up a rail line washed away by Tropical Storm Helene.
In separate letters issued to the Fortune 500 company this month, the Corps and the Tennessee Department of Environment and Conservation (TDEC) warned, the company’s dredging was unauthorized — and noted CSX had continued dredging activities even after being put on notice last month by both agencies.
The company is prohibited from performing “any excavation or dredging of material from the Nolichucky River or its tributaries in both Tennessee and North Carolina, the Dec. 2 letter from the Corps said. CSX must “immediately cease and desist” its dredging, TDEC’s Dec. 6 letter said.
Dredging poses serious risks to the river’s aquatic life and increases the potential of downstream flooding in the future for communities that rely on the Nolichucky for outdoor recreation and the tourist dollars it brings in, a lawsuit filed by lawyers with the Southern Environmental Law Center said last month.